Proposed New Erection Of 3 Storey with 2 Basement at Sixth Avenue

 

MAIN CONTRACTOR:

DAIYA ENGINEERING AND CONSTRUCTION Pte Ltd

Bored Pile and Secan Pile Wall Works 

Feb 2019 -August 2019

Contract Sum:
Project Value S$ 2.3 Million

 

KEPPEL FELS, KEPPEL SHIPYARD LTD – Crane Rail Foundation at 60 Shipyard Crescent Singapore

 

MAIN CONTRACTOR:
DGS ENGINEERING Pte Ltd
61, Grace Walk, Verdana Villas,
Singapore 554509

Contact: Mr. M.Z. Baig
Tel: +65 97321293

800mm Dia & 1200mm Dia Bored Piling works for Proposed Module and 50T Luffing Crane Rail Foundation.

June 2014 to Dec 2014

Contract Sum:
Project Value S$ 1,253,530/-

 

BENOI YARD, KEPPEL SHIPYARD LTD
Load Out Quay at 15 Benoi Road,
Singapore 629888

 

MAIN CONTRACTOR:
DGS ENGINEERING Pte Ltd
61, Grace Walk, Verdana Villas,
Singapore 554509

Contact: Mr. M.Z. Baig
Tel: +65 97321293

800mm Dia & 1200mm Dia Bored Piling Works for Load Out Quay Project.

June 2013 to Dec 2013

Contract Sum:
Project Value S$ 4,750,230/-

 

BENOI YARD, KEPPEL SHIPYARD LTD
Skid Beams, Quay 1 Land Side,
15 Benoi Road, Singapore 629888

 

MAIN CONTRACTOR:
DGS ENGINEERING Pte Ltd
61, Grace Walk, Verdana Villas,
Singapore 554509

Contact: Mr. M.Z. Baig
Tel: +65 97321293

800mm Dia Bored Piling Works for Skid Beams.

Dec 2012 to April 2013

Contract Sum:
Project Value S$ 1,121,800/-

 

KEPPEL TUAS YARD, KEPPEL SHIPYARD LTD
West Quay Wall Extension At 51 Pioneer Sector 1,
Jurong

 

MAIN CONTRACTOR:
DGS ENGINEERING Pte Ltd
61, Grace Walk, Verdana Villas,
Singapore 554509

Contact: Mr. M.Z. Baig
Tel: +65 97321293

Secant Bored Piling Works And Bored Piles For Bollard Foundations.
– Secant Bored Piling And Bored Piling Works

March 2012 to June 2012

Contract Sum:
Project Value S$ 1,364,400/-

 

TAI SENG FACILITY BUILDING, SINGAPORE
Bored Piling Works for Train Yard Facility for Circle Line and Downtown Line 3 Mass Rapid Transit.

 

MAIN CONTRACTOR:
BBR PILING Pte Ltd 50,
Changi South Street 1,
Singapore 486126,

Contact: Mr. Kwok Bin Wah Kelvin, Senior Project Manager
Tel: +65 65462280 Fax: +65 65462268

Contiguous Bored Piles and Foundation Piles comprising of 900, 1000, 1200 & 1500mm diameter and total number of piles are 275 Nos.

February 2011 to June 2011.

Contract Sum:
Project Value S$ 372,000/- (Boring only)

 

SENOKO POWER STATION Stage 1 Repowering
II Phase Development CCP4 & CCP 5, Singapore

 

MAIN CONTRACTOR:
ZELAN CONSTRUCTION Pte Ltd,
10, Anson Road, #13-08, International Plaza,
Singapore 079903

Contact: Mr Ng Geok Hin
Tel : +65 62275442 Fax : +65 62276527

Bored Piling Works for Gas Turbine Foundation, Building, HRSG Foundation, Transformer Area, Fuel Gas Receiving Plant and Water Tank Foundation. Bored Piles 1100 nos of 500mm, 600mm, 900mm, 1000mm & 1200mm diameter.

September 2002 to April 2003

Contract Sum:
Project Value S$ 4.126 Million

 

Basement Works at No. 80, Robinson Road

 

MAIN CONTRACTOR:
MITSUI CONSTRUCTION Pte Ltd,
Singapore

Basement Works comprises of Sheet Piles, Excavation and Grouting.

Contract Sum:
Project Value S$ 3.00 Million

 

Basement Works at Lau Pa Sat

 

MAIN CONTRACTOR:
KUMAGAI CONSTRUCTION Pte Ltd,
Singapore

Basement Works comprises of Sheet Piles and Excavation.

Contract Sum:
Project Value S$ 400,000/-

 

Basement Works at Merchant Road

 

MAIN CONTRACTOR:
KUMAGAI CONSTRUCTION Pte Ltd,
Singapore

Basement Works comprises of Sheet Piles, Strutting and Excavation.

Contract Sum:
Project Value S$ 350,000

West Coast Expressway (SECTION 3) SAE Interchange to FHR2/NKVE Interchange.

MAIN CONTRACTOR:
IJM Construction Sdn Bhd
C43-2, Danau Lumayan Avenue,
Bandar Sri Permaisuri,
56000 Kuala Lumpur

Tel : +603-9174 0978 Fax: +603- 9171 0715

Bored Piling Works.

April 2019 – to date

Contract Sum:
Project Value RM 8.3 Million

 

MRT V203 – Bored Piling Works at Jalan Ipoh and Kentonmen GUIDEWAY AND OTHER ASSOCIATED WORKS FROM JINJANG TO JALAN IPOH NORTH PORTAL.

MAIN CONTRACTOR:
IJM Construction Sdn Bhd
C43-2, Danau Lumayan Avenue,
Bandar Sri Permaisuri,
56000 Kuala Lumpur

Tel : +603-9174 0978 Fax: +603- 9171 0715

BORED PILING WORKS FOR VIADUCT.

July 2017 – November 2018

Contract Sum:
Project Value RM 5.3 Million

 

PROJEK MASS RAPID TRANSIT LEMBAH KLANG : JAJARAN SUNGAI BULOH-KAJANG. PACKAGE V5 (KUALA LUMPUR)

MAIN CONTRACTOR:
IJM CONSTRUCTION SDN BHD
C43-2, Danau Lumayan Avenue,
Bandar Sri Permaisuri,
56000 Kuala Lumpur

Tel : +603-9174 0978 Fax: +603- 9171 0715

Construction and completion of Viaduct Guideway and other associated works from Maluri portal to Plaza Phoenix station. Bored Piling works of 1000mm, 1200mm, 1350mm, 1500mm & 1800mm diameter piles. Bukit Ria & Phoenix Plaza Station Foundation.

April 2012 to September 2014

Contract Sum:
Project Value RM 30.100 Million

 

ELECTRIFIED DOUBLE TRACK PROJECT BETWEEN SEREMBAN-GEMAS PACKAGE 1 (SEREMBAN)

MAIN CONTRACTOR:
IJM-NORWEST JOINT VENTURE.
2318, 1st Floor Jalan SJ 10/1
Taman Seremban Jaya
70450 Seremban, Negeri Sembilan.

Tel : 603-6770 059 Fax : 603-6774 171

Bored Piling Works for BRV7, ROB 1 & BEBO ARCH. Bored Piles of 900 & 1200mm diameter.

December 2009 to March 2010
March 2011 to July 2011

Contract Sum:
Project Value RM 3.186 Million

 

ELECTRIFIED DOUBLE TRACK PROJECT SEREMBAN-GEMAS PACKAGE 1 (SEREMBAN)

MAIN CONTRACTOR:
IJM-NORWEST JOINT VENTURE.
2318, 1st Floor Jalan SJ 10/1
Taman Seremban Jaya
70450 Seremban, Negeri Sembilan.

Tel : 603-6770 059 Fax : 603-6774 171

Bored Piling Works for BRV 9 & ROB 3 TO 6. Bored Piles of 900 & 1200mm diameter.

July 2009 to December 2009

Contract Sum:
Project Value RM 3.605 Million

 

ELECTRIFIED DOUBLE TRACK PROJECT BETWEEN SEREMBAN-GEMAS PACKAGE 1 (SEREMBAN)

MAIN CONTRACTOR:
IJM-NORWEST JOINT VENTURE.
2318, 1st Floor Jalan SJ 10/1
Taman Seremban Jaya
70450 Seremban, Negeri Sembilan.

Tel : 603-6770 059 Fax : 603-6774 171

Bored Piling Works for BRV 03, 04, BRV 05 & BRV 06. Bored Piles of 900 & 1200mm diameter.

May 2009 to October 2009

Contract Sum:
Project Value RM 1.827 Million

 Lee Hedges PLC

MAIN CONTRACTOR:

 SINCON INTERNATIONAL
(PVT) LTD

Bored and Secant
Piling for the proposed multi storeyed office building at Colombo 03

Project Period : June 2019 to date

Contract Sum: 

Project Value Rs 220,000,000.00


Construction of Bridge at Ruwanwella-Phase 2

MAIN CONTRACTOR:

ELS Construction Ltd

Sub Contractor – Menand Machinery Only- Construction of Bridge at Ruwanwella-Phase 2

Project Period: January 2020

Contract Sum:
Project Value Rs 8,000,000.00


Construction of Brdge atRuwanwella-Phase 1

MAIN CONTRACTOR:

ELS Construction Ltd

Men and Machinery
Only- Construction of Brdge at Ruwanwella-Phase 1

Project Period : January 2020

Contract Sum:

Project Value Rs 7,037,000.00


Construction of New Bridge at Iranwila Chilaw

MAIN CONTRACTOR:

ELS Construction Ltd

Men and Machinery Only- Construction of New Bridge at
Iranwila Chilaw

Project Period : December 2019 to March 2020

Contract Sum:
Project Value
Rs 15,000,000.00


Construction of New Bridge at Iranwila Chilaw

MAIN CONTRACTOR:

ELS Construction Ltd

Men and Machinery Only- Construction of New Bridge at Iranwila Chilaw

Project Period : May 2019 till Date

Contract Sum:
Project Value Rs
30,835,419.00


Harithamothar Design Consultancy

MAIN CONTRACTOR:

Harithamothar Design Consultancy

Secant Piling Works-Construction of Sridevi Karumariamman Kovil at Colombo 13

Project Period

March 2019 to April 2019

Contract Sum:
Project Value Rs 9,100,000.00

Harithamothar Design Consultancy

MAIN CONTRACTOR:

Harithamothar Design Consultancy

Colombo Dockyard PLC

Bored Piling Works-Construction of Sridevi Karumariamman Kovil at Colombo 13

Project Period: Jan 2019 to Feb 2019

Contract Sum:
Project Value Rs 21,997,900.45


Melwire Hotels and resorts (Pvt) Ltd

MAIN CONTRACTOR:

SINCON INTERNATIONAL (PVT) LTD

Colombo Dockyard PLC

Men and Machinery Only for Bored Piling works At Jaela

Project Period: December 2018 to March 2019

Contract Sum:
Project Value Rs 8,743,500.00


Melwire Hotels and resorts (Pvt) Ltd

MAIN CONTRACTOR:

SINCON INTERNATIONAL (PVT) LTD

Colombo Dockyard PLC

Men and Machinery Only for Piling Works-Proposed Luxury Sea Front Hotel – Negombo

Project Period: April 2018 to November 2018

Contract Sum:
Project Value Rs 37,500,000.00


Re-Construcion of Bridge no 3/1 – Peliyagoda

 MAIN CONTRACTOR:
Colombo Dockyard PLC

Men and Machinery Only for Re-Construcion of Bridge no 3/1 – Peliyagoda

Project Period: May 2018 to August 2018

Contract Sum:
Project Value Rs 16,000,000.00


Concreting on 880 mm Dia secant piles – Colombo 03

MAIN CONTRACTOR:
Shapoorji Pallonji Lanka (Pvt) Ltd

Concreting on 880 mm Dia secant piles

Project Period : March 2018 to August 2018

Contract Sum:
Project Value Rs 7,022,612.00


Secant Piles – Expansion of Dock No 02 – Colombo 01

MAIN CONTRACTOR:
Colombo Dockyard PLC

Secant Piles – Expansion of Dock No 02  

Project Period: December 2017 to January 2018

Contract Sum:
Project Value Rs 23,138,760.00


Bored Piling Works-ICONIC GALAXY – Rajagiriya

MAIN CONTRACTOR:
ELS-ATIS Joint Venture (Pvt) Ltd

Bored Piling Works-ICONIC GALAXY

Project Period: April 2017 to Dec 2017

Contract Sum:
Project Value Rs 78,518,553.80


ALTAIR COLOMBO RESIDENTIAL TOWERS, Beira Lake

MAIN CONTRACTOR:

INDOCEAN DEVELOPERS (Pvt) Ltd
121A, Sir James Pieris, Mawatha,
Colombo 02

Colombo’s Tallest Residential Towers. Shotcrete Walls for the Altair Colombo Towers 

Project Period:  September  2014 to March 2015.

Contract Sum:

 Project Value US$ 2.0M

 
 

ALTAIR COLOMBO RESIDENTIAL TOWERS, Beira Lake

MAIN CONTRACTOR:

INDOCEAN DEVELOPERS (Pvt) Ltd
121A, Sir James Pieris, Mawatha,
Colombo 02

Colombo’s Tallest Residential Towers. Secant Pile Wall works for the Altair Colombo Towers Project
Period December 2013 to August 2014.

Contract Sum:
Project Value US$ 6.0M

 
 

HIGH RISE DEVELOPMENT At Kotahena, Colombo 13

MAIN CONTRACTOR:

WOH HUP INTERNATIONAL Pte Ltd
217 Upper Bukit Timah Road,
Woh Hup Building, Singapore

High Rise Residency Project 800mm, 1000mm & 1200mm Bored Piles
Period September 2013 to June 2014.

Contract Sum:
Project Value US$ 4M

 
 

SHANGRI-LA HOTEL DEVELOPMENT Galle Face, Colombo

MAIN CONTRACTOR:

AIOC (LANKA) Pte Ltd
217 Upper Bukit Timah Road,
Woh Hup Building, Singapore

Contiguous Bored Piles (CBP) Wall Works for the proposed Shangri-La Hotel Development – On lots 9132/1 & 9132/2 at Colombo Sri Lanka
Period May 2012 to November 2012.

Contract Sum:
Project Value US$ 10.0M

 
 

WORLD TRADE CENTRE, COLOMBO Echelon Square, Colombo 1

MAIN CONTRACTOR:

TURNER STEINER

1500 Sheet Piles and Basement Works 100,000 Cubic Meters of soil excavation.

Contract Sum:
Project Value US$ 3.0M

 
 

JAIC LANKA TOWER Staple Street, Colombo 2

MAIN CONTRACTOR:
KAJIMA-AOKI Joint Venture
481C Galle Road Colombo 3

Tel : 5004478 Fax : 500998

300 Nos of 1000mm Bored cast in-situ Piles for 34 Level Apartment.

Contract Sum:
Project Value US$ 800,000

 
 

NDB BUILDING 42 Navam Mawatha, Colombo 2

MAIN CONTRACTOR:

DEVELOPMENT HOLDINGS (Pvt) Ltd.
Tel. 437701-10

Piling Works for NDB Building.

Contract Sum:
Project Value Rs.30,134,000/- (US$ 371,500/-)

 
 

MERCANTILE HOUSE Navam Mawatha, Colombo 2

MAIN CONTRACTOR:

MERCANTILE LEASING Co. Ltd.

Piling Works for Mercantile House.

Contract Sum:
Project Value Rs.26,000,000/- (US$ 372,000/-)

 
 

CRESCAT RESIDENCIES Galle Road, Colombo 3

MAIN CONTRACTOR:

SINGAPORE PILING AND CIVIL ENGINEERING

100,000 CBM soil excavation / Retaining Wall.

Contract Sum:
Project Value Rs.35,000,000/- (US$ 500,000/-)

 
 

BANK OF CEYLON KANDY

MAIN CONTRACTOR:

BOC PROPERTY DEVELOPMENT and MANAGEMENT (Pvt) Ltd.

Foundation Piling Works.

Contract Sum:
Project Value Rs.26,956,636/- (US$ 337,000/-)

 
 

LAKDHANAVI LTD. KERAWALAPITIYA 300 MW CCP POWER PLANT

MAIN CONTRACTOR:

LANKA TRANSFORMERS
67 Park Street, Colombo 2

Contact : Mr Nuhuman Marikkar Chief Operations Officer
Tel : 0777-770839

500 no Piles of 600mm and 900mm diameter.

Contract Sum:
Project Value Rs.148,990,500/-.

 
 

LAKDHANAVI LTD. KERAWALAPITIYA 300 MW CCP POWER PLANT

MAIN CONTRACTOR:

LANKA TRANSFORMERS
67 Park Street, Colombo 2

Contact : Mr Nuhuman Marikkar Chief Operations Officer
Tel : 0777-770839

3 Test Piles and Load Testing

Contract Sum:
Project Value Rs.4,000,000/- approx. US$ 36,370/-

 
 

OCEAN TOWER DEVELOPMENT

MAIN CONTRACTOR:

ACCOR DEVELOPERS PVT. LTD.
9/12 Cambridge Place Colombo 7

Contact : Mr Arun Mehra / Mr H S Bhasin
Tel : 077-35977680777-681097

2 Test Piles and Load Testing, PTA and PDA Tests
Period – January – February 2007.

Contract Sum:
Project Value Rs.5,900,000/- US$ 55,150/-

 
 

SETMIL DEVELOPERS LANKA (PVT) LTD.

MAIN CONTRACTOR:

SETMIL MARITIME CENTRE
4th Floor – 256 Srimath Ramanathan Mawatha,
COLOMBO 15

Contact : Mr M D K Vallipuram
Tel : 2485601

Piling Works for Setmil Development project
Period – 2-1/2 months from 16/6/2006

Contract Sum:
Project Value Rs.65,287,232/50 US$ 646,408/-

 
 

KUMAGAI GUMI COMPANY LTD.

MAIN CONTRACTOR:

VALIENT TOWER
6th Floor – Navam Mawatha COLOMBO 2

Contact : Mr Kitamura
Tel: 0777-681097

Piling Works for bridges in Wakwella, Galle – Reconstruction of bridges affected by tsunami.

Contract Sum:
Project Value Rs.20,000,000/- US$ 198,000/-

 
 

PIONEER PROPERTIES & LEE HEDGES LTD

MAIN CONTRACTOR:

PIONEER PROPERTIES & LEE HEDGES LTD
418 R A de Mel Mawatha Colombo 3

Contact : Mr K N Gunasekera
Tel : 2574358

CBP, excavation, dewatering, grouting etc.
Period – Mid June 2006 to December 2006

Contract Sum:
Project Value Rs.221,436,739/- US$ 2,170,948/-

 
 

PENTA – OCEAN CONSTRUCTION COMPANY

MAIN CONTRACTOR:

PENTA – OCEAN CONSTRUCTION COMPANY

Contact : Mr. Y Kasai
Tel : 2449978

Piling works – Dockyard
No 2 Dock entrance widening & Construction of crane rail projects
Period – 21/9/2005 – December 2005

Contract Sum:
Project Value Rs. 20,987,000/-

 
 

PIONEER PROPERTIES & LEE HEDGES LTD

MAIN CONTRACTOR:

PIONEER PROPERTIES & LEE HEDGES LTD
418 R A de Mel Mawatha Colombo 3

Contact : Mr K N Gunasekera
Tel : 2574358

Piling Contract – 1800mm dia piles for “Mayfair City” project
Period – 01/09/2005 to 10/2/2006

Contract Sum:
Project Value Rs.212,000,750/- US$ 2,120,000/-

 
 

SERENDIB FLOUR MILLS PTE. LTD.

MAIN CONTRACTOR:

SETMIL MARITIME CENTRE
1st Floor – 256 Srimath Ramanathan Mawatha, COLOMBO 15
Tel : 386985/7 Fax : 386989

Contact : Mr Sathak Abdul Kadar Chief Executive Officer
Tel : 0777-878787

Mr A Ganesh SeniorProject Engineer
Tel : 0777 701912

Piling Contract – 634 Nos 800mm dia Piles for Flour Mill at Prince Vijaya Quay, Colombo Port. (Principals in Dubai – ETA) With special machinery brought in addition to our machinery under the direction of the Consultants to the client the balance piling work is proceeding .
7 November 2003

Contract Sum:
Project Value 800 Piles under normal soil conditions –
US$ 4.0 Million final cost approx. Rs.125,000,000/- (US$ 1,190,500/-)

 
 

CEYLON BISCUITS LTD

MAIN CONTRACTOR:

CEYLON BISCUITS LTD Makumbura, Pannipitiya
Tel : 2855846 Fax : 2855367

Contact : Mr J Thenabadu Project Director

Piling Contract – 40 Piles For Office Building Pile Capping
12 July 2003

Contract Sum:
Project Value Rs.4.0Million (US$ 43,500/-) Piling completed in Ten days.

 
 

DUTCH PROPERTY DEVELOPMENT PVT LTD.

MAIN CONTRACTOR:

DUTCH PROPERTY DEVELOPMENT PVT LTD.
97 Galle Road, Kaldemulla MORATUWA
Tel : 2626237 Fax : 4-214745

Contact : Mr S.Coomaraswamy Director

Piling Contract – 118 Piles For Apartment Complex Pile Hacking
12 June 2003

Contract Sum:
Project Value Rs.11.5Million (US$ 125,000/-)

 
 

CENTURY PROPERTIES PVT. LTD.

MAIN CONTRACTOR:

CENTURY PROPERTIES PVT LTD.
27-5/1 York Arcade Building York Arcade Road, Colombo 1

Contact : Mr Vish Govindsamy,
Tel : 4702400

Mr Anand
Tel : 0777684949

Piling Contract – For construction of Warehouse at Kelaniya 77 Nos Piles
29 March 2002

Contract Sum:
Project Value Rs.9.35Million (US$ 101,630/-) Piling completed in September 2002

 
 

LARSEN & TOUBRO CEYLINCO (PVT) LTD.

MAIN CONTRACTOR:

LARSEN & TOUBRO CEYLINCO (PVT) LTD.
250 – 3/3 Liberty Plaza R A de Mel Mawatha, Colombo 3
Tel : 577142, 301928 Fax : 301928

Contact : Mr S Varma Project Manager
Tel : 0777- 325469

Piling Contract – 1250 Piles For Construction of 168.1 MW Diesel Fired Combined Cycle Power Plant for AES Kelanitissa Private Limited Pile Hacking
27 March 2001

Contract Sum:
Project Value Rs.145,910,000/- Material supplied by the Client (US$ 1,620,000/-) Piling completed on 30 November 2001

 
 

SAMUDRA CEMENT COMPANY LANKA (PVT) LTD. Consultants . STUP in India. Construction of 20,000MT Cement Silo at Colombo Port

MAIN CONTRACTOR:

SAMUDRA CEMENT COMPANY LANKA (PVT) LTD.
469 1/1 Galle Road Colombo 3
Tel : 500466, 587619, 592308-9 Fax : 500897

Piling – 198 Nos LOAD TEST – 2 initial load tests for 600 and 1,000mm dia piles. 900MT and 350MT loads were applied respectively on 1,000mm and 600mm dia piles. Two routine load tests on 600mm and 1,000mm dia piles were carried out.
6 June 2000.

Contract Sum:
Project Value Rs.22,000,000/- (US$ 45,000/-)

 
 

PILLAR-ASSET CORPORATION (Pte) Ltd. ‘SAHASPURA’ HIGH-RISE HOUSING PROJECT

MAIN CONTRACTOR:

PILLAR-ASSET CORPORATION (Pte) Ltd.
86 Old Road, off 4th Lane Nawala
Tel : 341281, 864600 Fax : 351282

No.60 Baseline Road, Colombo 8 Piling LOAD TEST – Two (2) Compressive Ultimate Load Tests using 4 anchor piles were carried out. Load applied 550 MT.
18 October 1999

Contract Sum:
Project Value Rs.15,300,000/- Machinery and labour only (US$ 170,000/-)

 
 

RESIDENCE FOR MR VASHDEV RAMCHANDANI

MAIN CONTRACTOR:

MR VASHDEV RAMCHANDANI
Tel : 637439 Fax : 577520

No.3 Park Place, Colombo 5 Piling for 3 Storied residence
17 February 1999

Contract Sum:
Project Value Rs.3,500,000/- Piling completed on 16 March 1999 (US$ 43,750/-)

 
 

LINCOLN APARTMENTS 67 Ward Place, Colombo 07

MAIN CONTRACTOR:

LINCOLN PROPERTY HOLDINGS (Pvt) Ltd.
Tel : 692369 Fax : 692392

Pile Foundation LOAD TEST – 450 and 650MT Load Tests using kentledge have been carried out 18 October 1998

Contract Sum:
Project Value Rs.9,957,000/- (Machinery and labour only) (US$ 120,000/-)Lee
Hedges PLC

 

MAIN CONTRACTOR:

SINCON
INTERNATIONAL (PVT) LTD

 

Bored and Secant Piling for the proposed multi storeyed office
building at Colombo 03

Project Period

June 2019 to date

 

Contract Sum:
Project
Value Rs
220,000,000.00 

PUBLIC BANK
(CAMBODIA)

MAIN CONTRACTOR:

NWKA Chartered Architect
Block F1 Unit No.15-2 Jalan PJU 1/42,
Dataran Prima 47301 Petaling Jaya,
Selangor Darul Ehsan, Malaysia

Contact: Mr AR NG Wai Keong
Tel : 603-7880 7381 Fax : 603-7880 7371

Basement and Sub-structure works for proposed 8 storey building with 2-11/2 basement
(with secant pile wall)

6 months from November 2006

Contract Sum:
Project Value US$ 6.0 Million

SKY LUXURY RESIDENCE

Thong-Lor, Bangkok

Main Contractor

NORTHCROFT (THAILAND) LTD

Room 1007, 10th Floor Vanit Building II, 1126/2, New Petchburi Road, Makkasan, Rajthevee, Bangkok 10400

Bored Piling Works – 1000mm dia piles

Contiguous Bored Pile Works – 600mm dia piles

Project Period: Dec 2016 to March 2017

Project Value: US Dollar 800,000

 

EKKAMAI MALL

Bangkok

 Main Contractor

TOA-PPIH Co., LTD

107 Soi Charoensuk Sukhumvit 63 Rd., Khlongton Nua, Wattana, Bangkok, Thailand, 10110, Thailand

 

Bored Piling Works – 800mm dia piles

Contiguous Bored Pile Works – 600mm dia piles

Project Period: March 2017 to July 2017

Project Value: US Dollar 2.8 Million

 

 HOTEL 39

Chareon Nakhorn, Bangkok

 Main Contractor

Bored Piling works for hotel

(600mm & 800mm dia piles)

Project Period: Sept 2017 to Nov 2017

Project Value: US Dollars 440,000

 

 SKY LUXURY RESIDENCE

Thong-Lor, Bangkok

 

Main Contractor

Bored Piling works for Luxury Residence Condo

(600mm & 800mm dia piles)

Project Period: July 2017 to Oct 2017

Project Value: US Dollars 1.2 million